2025/26 School Year Updates

Good Morning and Welcome Back,

I wanted to welcome everyone to the start of the new school year and give some exciting news about your Facilities upgrades that continue improve the quality of spaces throughout the college.

Again, the college is undergoing some dramatic changes. Change can be noisy, dusty and sometimes painful, but necessary at times in order to provide an up to date teaching and learning environment. My group and I are pleased to be part of such an exciting time and will try our best to make all of the changes as painless as we possibly can. If you need assistance at any time please call or email our ticket system at facilities@vetmed.illinois.edu

Ongoing Construction, Renovation, and Upgrade Projects at Vet Med


Oncology Addition

  • Moving along nicely: framing interior walls, installing infrastructure, roofing, grade work, etc.
  • Siding panels and windows expected in 5–6 weeks.
  • Substantial completion: 3-9-2026.

Parking Lot F27 Bus Lane

  • Old bus lane removed and replaced with new solid concrete.
  • Lane is now free of large holes that could damage vehicles.
  • Striping work scheduled for mid-September.

Basic Sceince Building Classroom 2258 AV/Facility Upgrade

  • Much-needed AV upgrade completed (thanks to AV coordinator).
  • Installed new ceiling, lighting, and controls.
  • Removed legacy equipment for a modern feel.

Large Animal Clinic Auditorium 100

  • New AV system installed (thanks to AV coordinator).
  • New carpeting, seating (with electrical outlets), and podium.
  • Winning design chosen by students earlier this year.
  • Handrails for safer egress currently in production and will be installed after fabrication.

Large Animal Clinic Locker Rooms

  • Block work ongoing; completion expected in next few weeks.
  • Tile, ceilings, and fixtures to follow.
  • Project completion: late September.

Round Barns

  • East barn and manager’s house went out to bid 8-14-2025.
  • Bid opening: September.
  • Construction begins: November.
  • Middle and west barns in design phase; completion expected December.

Equine Recovery Stall Emergency Doors

  • New emergency doors purchased.
  • Scheduled installation: October.

Small Anicmal Clinic Air Handling Unit Replacement

  • Currently at 50% design phase.
  • Replacing last remaining original air handler in SAC.

ASA Remodel

  • In final stages of design.
  • Goes to bid in the next month.
  • Complete redesign of ASA offices to better serve students.

Veterinary Diagnostic Lab Trim Room

  • Nearing final completion.
  • Ceiling, lighting, and flooring being wrapped up.
  • Equipment shipping in September.

Orthopedic / Rehabilitaion Upgrades

  • Preliminary space design discussions underway with Rehab/Ortho staff.

Hunt Sculpture Upgrades

  • New landscape designs completed.
  • Aim: make the sculpture more accessible and a campus focal point.

Standing Equine CT

  • Project in design phase.
  • Will bring much-needed standing CT for large animal.

South Clinic Phase 2–3 Addition

  • Early design/development stage.
  • Potential additions: more exam rooms, offices, and a larger rounds room.

On another note, the Dean and I had a very constructive meeting with campus parking and they are investing some more capital to remedy some of the short falls at our college. Some of these projects are ready to deliver, while others are in the process of design work.

  • They will be adding additional spots to the south lot of F27. We are hoping to see 20-25 spots in this location
  • They will be begin design phase of the north lot of F27 this fall. They are hoping to get a minimum of 80-100 spots in this location.
  • They are going to complete a safety study on Lincoln avenue to look at potential spots south of Hazelwood Drive.

We really appreciate delivering these improvements to the college and looking forward to another exciting year. If there are items or information missing please do not hesitate to ask and we will try our best to answer your questions.

Thanks again for all of your patience.

Sincerely,

Brandon

11/12/20 Weekly Update

Good Morning,

We are pleased to say that Phase 1 of the expansion project is getting close to completion and that we will be able to take ownership of the space in the next couple of months. I know that we have been pushed to our limits with the pandemic and all the unknowns that this has brought us but I want to say that the Vet Med Facilities group continues to push hard to make up lost time and complete the projects that were so close to completion before we had to close them down.

We are in the process of lab improvements at Basic Science Building due to new faculty hires. We have been able to complete the Dentistry remodel, pharmacy clean room, LAC sliding doors, the Equine lameness arena, as well as the Ambassador residence. We have also completed the new Ophthalmology space which will become a flex space for services as we move to complete the expansion project.

We have initiated two new projects that will begin in the coming months. One will be a new incinerator located just west of the old one in VDL and the other will be an AG research building at our research farm on South Race Street.

Again, the college is undergoing some dramatic changes. Change can be noisy, dusty and sometimes painful, but necessary at times in order to provide an up to date teaching and learning environment. My group and I are pleased to be part of such an exciting time and will try our best to make all of the changes as painless as we possibly can. If you need assistance at any time please call or email our ticket system at facilities@vetmed.illinois.edu

VTH update

Expansion project

The project has been released and the work has resumed.

  • Roofing work is completed
  • Epoxy flooring in being installed in the new OR’s and charting area
  • IR equipment is being installed
  • First three surgery lights are being installed in the north OR rooms
  • Cabinetry has been installed in the OR suite. We are awaiting countertops to complete casework installation
  • Mechanical work continues and electrical panels are set as well as many tie ins for HVAC, steam, etc.
  • Air Handler is being hooked up and duct work will begin
  • Exterior site is completed with new sidewalks, grass, plants and trees

SAC

  • Dentistry completed and staff are now serving patients in this newly remolded space
  • Adding insulation and drywall over exam room windows as a sound deadener between expansion project and patient exam space

LAC

  • New motorized doors have been installed in all four wards
  • Painting on exterior doors taking place to mitigate rust issues
  • New Respiratory gating camera installed in the 128CT room

Equine Lameness arena

  • Building was erected and finished on 6-22-20
  • Lighting and fans were installed
  • Concrete testing area installed
  • Sand/fiber testing area installed
  • Grass seeding completed around the building

Pharmacy Clean Room

  • Clean room has been completed
  • Certification took place on 10-12-20
  • Hepa
  • Room to be certified on 11-16-20

Ophthalmology

  • Remodel has been completed
  • Exam light installation in next few weeks
  • Rounds room furniture to be installed in next few weeks

BSB update

Pathobiology

  • Lab remodels continue for new faculty members

Comparative Biosciences

  • Lab remodels continue for new faculty members

Veterinary Diagnostic Lab

  • Work has begun to convert several areas to BSL2 areas which will include four new storefront doors to separate current spaces
  • Incinerator replacement project is in swing and the team is working through the details with F&S and the engineering firm
  • Incinerator has gone out to bid

Grounds Improvements

  • shrubs in front of BSB  entry were removed due to severe overgrowth
  • we are working with grounds to develop a new plant bed
  • new work will also include seeding/plantings around the outside dog on east side of VTH, outside the courtyard area, as well CLSC and the south clinic
  • Rock parking area for Vet Med fleet vehicles installed next to hayshed

Clinical Skills Roof

  • New roof being installed
  • Completion of roof is scheduled for 11-23-20

Ambassador Residence

  • Building complete
  • Landscaping is now taking place, grass, bushes, trees, etc.

South Clinic

  • Installation of new emergency phone began 10-27-20
  • Installation of new washer/dryer sets took place on 10-26-20
  • Installation of new counters in two offices occurred week of the 19th

If there are items or information missing please do not hesitate to ask and we will try our best to answer your questions.

Thanks again for all of your patience.

Sincerely,

Brandon

10-28-20 Weekly Update

Good afternoon,

As we are all aware, Facilities group has been in full swing since May and we have resumed all of our projects at the college. We are pushing hard to make up lost time and complete the projects that were so close to completion before we had to close them down.

We are in the process of lab improvements at Basic Science Building due to new faculty hires. We have been able to complete the Dentistry remodel, pharmacy clean room, LAC sliding doors, the Equine lameness arena, as well as the Ambassador residence. We have also completed the new Ophthalmology space which will become a flex space for services as we move to complete the expansion project.

We have initiated two new projects that will begin in the coming months. One will be a new incinerator located just west of the old one in VDL and the other will be an AG research building at our research farm on South Race Street.

Again, the college is undergoing some dramatic changes. Change can be painful, but necessary at times in order to provide an up to date teaching and learning environment. My group and I are pleased to be part of such an exciting time and will try our best to make all of the changes as painless as we possibly can. If you need assistance at any time please call or email our ticket system at facilities@vetmed.illinois.edu

VTH update

Expansion project

The project has been released and the work has resumed.

  • Roofing work is being completed with the rest of the panels being installed in the coming days
  • Epoxy flooring in being installed in the new OR’s
  • Cabinetry is being installed in sterile processing
  • Mechanical work has begun and electrical panels are set as well as many tie ins for HVAC, steam, etc.
  • Air Handler is being hooked up and duct work will begin
  • Exterior site is completed with new sidewalks, grass, plants and trees

Dentistry

  • Staff are now serving patients in this newly remolded space

LAC

  • New motorized doors have been installed in all four wards
  • Painting on exterior doors taking place to mitigate rust issues

Equine Lameness arena

  • Building was erected and finished on 6-22-20
  • Lighting and fans were installed
  • Concrete testing area installed
  • Sand/fiber testing area installed
  • Grass seeding completed around the building

Pharmacy Clean Room

  • Clean room has been completed
  • Certification took place on 10-12-20
  • Room passed certification and is ready to use

Ophthalmology

  • Room has been completed
  • Exam light installation in next few weeks

BSB update

Pathobiology

  • Lab remodels continue for new faculty members

Comparative Biosciences

  • Lab remodels continue for new faculty members

Veterinary Diagnostic Lab

  • Work has begun to convert several areas to BSL2 areas which will include four new storefront doors to separate current spaces
  • Incinerator replacement project is in swing and the team is working through the details with F&S and the engineering firm
  • Incinerator has gone out to bid

Grounds Improvements

  • shrubs in front of BSB  entry were removed due to severe overgrowth
  • we are working with grounds to develop a new plant bed
  • new work will also include seeding/plantings around the outside dog on east side of VTH, outside the courtyard area, as well CLSC and the south clinic
  • Rock parking area for Vet Med fleet vehicles installed next to hayshed

Clinical Skills Roof

  • New roof being installed
  • Completion of roof is scheduled for 11-13-20

Ambassador Residence

  • Building complete
  • Landscaping is now taking place, grass, bushes, trees, etc.

South Clinic

  • Installation of new emergency phone began 10-27-20
  • Installation of new washer/dryer sets took place on 10-26-20
  • Installation of new counters in two offices occurred week of the 19th

If there are items or information missing please do not hesitate to ask and we will try our best to answer your questions.

Thanks again for all of your patience.

Sincerely,

Brandon

College of Veterinary Medicine Facilities